2023 Road and Sidewalk Plan

The following road construction projects are planned for the 2023 construction season. (Please note, all plans are subject to change).

ROAD PAVING

  • Gray Squirrel Circle - (complete) paving scheduled for Thursday, July 6
  • Blueberry Hill Road - (complete) paving scheduled for Friday, June 30 
  • Buttercup Lane - Reclaim (complete)
  • Clover Lane - Reclaim (complete) 
  • Cottage Street - Mill (complete) - paving scheduled for Wednesday, July 5
  • Drybridge Road - Reclaim (complete)
  • Forest Road - Reclaim (complete)
  • Hemlock Drive - Reclaim (complete)
  • Holliston Street - Mill (complete) 
  • Jasmine Road - Mill (complete) Paving scheduled for Thursday, June 29
  • Liberty Street - Mill (complete) Paving scheduled for Thursday, June 29
  • Mallard Drive - Reclaim (complete)
  • Nobscott Road - Mill (complete) Paving scheduled for Friday, June 30
  • Rainbow Drive - Mill (complete) Paving scheduled for Thursday, June 29
  • Redgate Drive - Reclaim (complete) 
  • Short Street - Mill (complete) Paving scheduled for Thursday, June 29
  • Spring Street - Mill (complete) Paving scheduled for Friday, June 30
  • Winthrop Street (Drain Work area) - Mill  (complete) - Paving scheduled for Friday, June 30

CRACK SEALING

  • Broad Street
  • Summer Hill Road
  • Ohlson Circle
  • Appleton Road
  • Ellis Street (Applegate Rd to Walnut Lane)
  • Walnut Lane
  • Sun Valley Drive
  • Saddle Hill Road
  • Spruce Road
  • Puddingstone Lane
  • Fairway Lane (Holliston St. to powerlines)
  • Skyline Drive
  • Legion Avenue
  • Hooksett Circle
  • Bayberry Lane

SIDEWALK IMPROVEMENTS

  • Holliston Street - 3 potential phases (in progress)
  • Village Street - Island Road to Charles River Pollution Control Facility (in progress)
  • Main Street sidewalks - (complete) 

Have you ever wondered what pavement treatments the Town uses to repair and maintain streets? (Scroll to the bottom of this page to watch a few short video demonstrations of the various processes). 

CURRENT CONSTRUCTION PROJECTS

 

WEST STREET AT BEECH STREET

Road reconstruction and sidewalk improvements. (the project is moving along. Currently waiting for Comcast to move equipment & Verizon to remove poles)

MAIN STREET SIDEWALKS

Sidewalk Work from Richard Rd to Lee Lane. (near completion - handicap ramps to be installed)

 

PAVEMENT TREATMENTS

Watch these videos to learn more!

What is Crack Sealing?

A crack seal is used to prevent water and moisture from penetrating roadways and is typically used when roadways are showing signs of cracking. Watch a YouTube video: Crack Sealing

What is Asphalt Milling?

Pavement milling is the process of removing at least part of the surface of a paved area, such as a road, bridge, or parking lot. Milling removes anywhere from just enough thickness to level and smooths the surface to a full-depth removal. Watch a video on Asphalt Milling 

What is Paving? 

Pavement (architecture), an outdoor floor or superficial surface covering; Road surface, the durable surfacing of roads and walkways. Road paving video courtesy of Smith Road Construction

What is Road Reclaiming?

Street reclaiming is the process of converting or otherwise returning streets to a stronger focus.  Watch a video on Road Reclaiming - Maple Street, Medway, MA

 

LINK TO THE FY 25-27 ROAD AND SIDEWALK IMPROVEMENT PLAN