Route 109 Update for the week of May 22, 2017
Posted on: May 22, 2017 - 7:57am
The contractor will continue installing catch basins and connecting them to the drain manholes along Main Street. Verizon and Eversource will continue moving and/or stringing new wire to the new poles along Main Street and Milford Street.